A+ A A-

RWA-LS-Berk-BP-1to5

document
Version:
TS 2014
Uploaded:
Sunday, 22 June 2014
Hits:
4889
Downloads:
1131

RWA-LS-Berk-BP-1to5 by Bill Peck

RWA-LS-Berk-BP-1to5.zip - 500 kb

This is a set of 5 scenarios designed to be run in order by Bill Peck of the NERW Crew.

Description

 

This is a set of 5 scenarios designed to be run in order by Bill Peck of the NERW Crew.

Required:

RWA Lakeside donation ware route
RWA Berksire
Harry Adkins RWA Reefer packs 1 and 2

===========================================================

This the first of five Berkshire activities on the RWA Lakeside Donation ware route.

It is late summer early autumn the grain silos are loaded. There is a double string of hoppers being held on the sidings north of Waterton. Grab a caboose and go get the cars. Always check the route and set the switches. Be aware of the lights and request permission to pass.

Anomalies noted when coupling to the caboose the coupler becomes in active for use in the Hud view and must be uncoupled from the external view.

===========================================================

This is the second of five Berkshire activities on the RWA Lakeside Donation ware route.

We are cleared to the Atlantic Grain work area. Check set your switches and make sure the Adkins switches are set to the main.

Enjoy the run and watch your speed

===========================================================

This is the third of five Berkshire activities on the RWA Lakeside Donation ware route.

The train is back together and the hoppers are loaded. The RS is attached to the rear. We are cleared to return to Waterton we will be going through the North Branch wye then heading back. 

Abnormality noted the reverser can not be activated without the throttle being in the zero position this due to the diesel being on the train.

===========================================================

This the fourth of five Berkshire activities on the RWA Lakeside Donation ware route.

This the hardest of the five activities. Begin by picking Trk 1 and go from there. Make sure to check the activity on the 2 D view map and set the switches accordingly. Make sure switches at Adkins and Rid out are set to the main line. When working the Cold storage are be advised that you will be working close to the buffer.

Abnormalities noted the uncoupling of the cars next to the engine/tender require the external view.

Good news you can save at any time any speed and step out and return.

===========================================================

This is the fifth and last of five Berkshire activities on the RWA Lakeside Donation ware route.

We have a string to pick up and return to Waterton and our day will be done. You will spot the Caboose then reverse the engine using the wye.
Tab for permission on all lights in the Wye area. Make sure the switches are set to the main line at Ridout and Adkins. Enjoy the run see you next time.

Please accept license agreement before downloading

Please remember even those this file is free, the author still has rights to the file. Be sure to read the readme that is enclosed for further copyright information and instructions to install the file.

 

DTG's Required Disclaimer

"IMPORTANT NOTICE. Everything on this site is user generated content designed for use with RailSimulator.com Limited’s train simulation products, including RailWorks 4: Train Simulator 2013, Train Simulator 2014 and Train Simulator 2015. RailSimulator.com Limited does not approve or endorse this user generated content and does not accept any liability or responsibility regarding it.

This user generated content has not been screened or tested by RailSimulator.com Limited. Accordingly, it may adversely affect your use of RailSimulator.com’s products. If you install this user generated content and it infringes the rules regarding user-generated content, RailSimulator.com Limited may choose to discontinue any support for that product which they may otherwise have provided.

The RailWorks EULA sets out in detail how user generated content may be used, which you can review further here: www.railsimulator.com/terms. In particular, this user generated content includes work which remains the intellectual property of RailSimulator.com Limited and which may not be rented, leased, sub-licensed, modified, adapted,copied, reproduced or redistributed without the permission of RailSimulator.com Limited."

HOT NEWS

Search Entire Site

Latest additions in this category

Created: November 2, 2014
Hits: 5031 - Downloads: 2304
Created: November 2, 2014
Hits: 6559 - Downloads: 3214
Created: August 16, 2014
Hits: 4479 - Downloads: 1104
Created: August 16, 2014
Hits: 4052 - Downloads: 965
Created: August 16, 2014
Hits: 3767 - Downloads: 875
Created: July 6, 2014
Hits: 4525 - Downloads: 1108
Created: June 22, 2014
Hits: 4890 - Downloads: 1131
Created: June 21, 2014
Hits: 4587 - Downloads: 1001
Created: June 8, 2014
Hits: 4725 - Downloads: 1099
Created: June 8, 2014
Hits: 4249 - Downloads: 717
Created: June 8, 2014
Hits: 4061 - Downloads: 702
Created: June 8, 2014
Hits: 4148 - Downloads: 729
Created: June 8, 2014
Hits: 3950 - Downloads: 688
Created: June 8, 2014
Hits: 3847 - Downloads: 722
Created: June 1, 2014
Hits: 4446 - Downloads: 895
Created: June 1, 2014
Hits: 3896 - Downloads: 727
Created: June 1, 2014
Hits: 3936 - Downloads: 735
Created: June 1, 2014
Hits: 3989 - Downloads: 756
Created: June 1, 2014
Hits: 4014 - Downloads: 745
Created: June 1, 2014
Hits: 3993 - Downloads: 731

Visitors Counter

45035640
Today
Yesterday
This Week
This Month
Last Month
3746
16602
57524
562123
717575

Your IP: 18.188.29.0

Who's Online

We have 2881 guests and no members online

blue green orange red

Copyright 2018 by Mutagenix - A subsidiary of the NERR Network. Best viewed at 1280 x or more.