well i got board and decided to start ANOTHER progect

..........this time it is a prarrie route! i have started on a small (around 20-30 miles when finished) prarrie branchline with a fair ammount of traffic. the route will primairly carry grain, but the branch has many small induistrys along the way too! Induistrys like a small cement plant, furniture factory, lumber related induistrys......ect! the route will have 2 or 3 small to medium sized yards basically for sorting freight from or for local induistrys. This time i have decided to start in the center of the route in a small town, this is the one with the cement plant, and also every town has an elevator that is either acticve or abandoned. oh btw this route is a modern route. there is another large induistry along the branch that gives the line so much traffic but i will not tell you what that is quite yet....you will hafto figure it out on your own from the screenshots! the trackage is a single line but with 1-2 mile long passing sidings for the ************ trains to pass the locals and grain trains. now how about the first screenshots of the route?
Screenshot_Valan Branch_0.00613--0.00020_12-02-42.jpg
Screenshot_Valan Branch_0.00238--0.00001_12-02-07.jpg
Screenshot_Valan Branch_0.00262--0.00013_12-02-17.jpg
Screenshot_Valan Branch_0.00346-0.00018_12-05-41.jpg
Screenshot_Valan Branch_0.00592--0.00024_12-03-16.jpg
Screenshot_Valan Branch_0.00799-0.00098_12-03-26.jpg
You do not have the required permissions to view the files attached to this post.