Track on bridge question

Discussion about RailWorks route design.

Track on bridge question

Unread postby slick204 » Thu Sep 10, 2015 10:54 pm

First off, I'm fairly new to laying out track. I've done some and learned a few things but am confused about many others.

Here's what I'm trying to do: I have a section of track that I want to put a river under. I've lowered the terrain and put in the water. I've place a bridge under the track. I want to change the style of track on the bridge to the kind that doesn't have ballast. I split the track at both ends of the bridge and deleted the existing track. I change the track style, snap the arrow to one end and extend the track to the other but I can't get it to connect to the other end. It's a fairly straight section of track so when I extend the track it snaps to perfectly straight (yellow guide) but apparently the existing track has a slight curve and I end up not connected and slightly to one side.

Is there any way to make this work? I did note and match the gradient of the existing track and have tried with the snap to track button both on and off.

Thanks for your help!
User avatar
slick204
 
Posts: 537
Joined: Fri Mar 23, 2012 8:29 pm
Location: Minnesota

Re: Track on bridge question

Unread postby gwgardner » Thu Sep 10, 2015 11:01 pm

You can try running the new track through the end that it won't connect to, attempting to create a junction/switch. If that does indeed create a junction, and thus a connection, then simply delete the portion of the junctiion that you don't want. Snap should be off. Hope it works.
gwgardner
 
Posts: 701
Joined: Tue Jan 25, 2011 2:34 pm

Re: Track on bridge question

Unread postby robbit » Thu Sep 10, 2015 11:56 pm

instead of deleting the track on the bridge just select it with the select tool and then change the type in the popup on the right that comes up
robbit
 
Posts: 839
Joined: Fri Jul 15, 2011 11:29 am
Location: Maine

Re: Track on bridge question

Unread postby slick204 » Fri Sep 11, 2015 7:21 pm

Thanks for the suggestions. Gary, the tracks are almost inline so it won't make a junction. Robbit, I tried your method but since I had already split the track at both ends of the bridge it doesn't quite work. When I try and select the entire segment, I always end up with a small gap in the rails at one end. I've tried many times but can't get it to work. I tried it on a continuous piece of track and it works perfectly. I think I need to relay the track, unfortunately it has a couple of switches and a crossover.

It's frustrating but I want to do it correctly! !*hp*!

Thanks again.
User avatar
slick204
 
Posts: 537
Joined: Fri Mar 23, 2012 8:29 pm
Location: Minnesota

Re: Track on bridge question

Unread postby BoostedFridge » Fri Sep 11, 2015 7:29 pm

slick204 wrote:Thanks for the suggestions. Gary, the tracks are almost inline so it won't make a junction. Robbit, I tried your method but since I had already split the track at both ends of the bridge it doesn't quite work. When I try and select the entire segment, I always end up with a small gap in the rails at one end. I've tried many times but can't get it to work. I tried it on a continuous piece of track and it works perfectly. I think I need to relay the track, unfortunately it has a couple of switches and a crossover.

It's frustrating but I want to do it correctly! !*hp*!

Thanks again.


I know the frustration you're going through all too well. It could very well be easier to relay the entire section of track from an easier starting point. After it's connected to your existing track properly, go back and use the select tool on the bridge trackage as robbit described.
User avatar
BoostedFridge
 
Posts: 2277
Joined: Sat Aug 24, 2013 6:39 am
Location: Vancouver, BC

Re: Track on bridge question

Unread postby slick204 » Fri Sep 11, 2015 8:32 pm

Yep, that's what I did. It went much faster this time and worked out perfectly and corrected a couple other problems too. I also used Gary's method to reconnect to my existing track down the line.
*!!thnx!!* *!!thnx!!*
Bridgework.jpg
You do not have the required permissions to view the files attached to this post.
User avatar
slick204
 
Posts: 537
Joined: Fri Mar 23, 2012 8:29 pm
Location: Minnesota

Re: Track on bridge question

Unread postby SAR704 » Sun Sep 13, 2015 6:27 am

The route looks good. The atmosphere reminds me of a couple of narrow gauge MSTS routes. Feel free to post some more screenshots if you want
Geforce GTX 1060
16GB RAM
Intel Core i5-3350 3.10ghz
Win te(n) Home
SAR704
 
Posts: 716
Joined: Tue Jun 21, 2011 9:48 am
Location: Adelaide, South Australia

Re: Track on bridge question

Unread postby gwgardner » Sun Sep 13, 2015 7:15 am

That's the era I'm interested in with Trainsim. I hope you complete and release the route.
gwgardner
 
Posts: 701
Joined: Tue Jan 25, 2011 2:34 pm

Re: Track on bridge question

Unread postby slick204 » Mon Sep 14, 2015 12:32 pm

I'll release it if I ever finish it. This is the third time I've started it. This time I'm taking some advice given here to lay small sections of track and add scenery before moving on. Finding the right piece of scenery and what it looks like is the hardest part! !**duh*!!
User avatar
slick204
 
Posts: 537
Joined: Fri Mar 23, 2012 8:29 pm
Location: Minnesota


Return to Route Design

Who is online

Users browsing this forum: No registered users and 0 guests