


Railfan722 wrote:Route looks amazing, although the service mode is definitely going to be what holds me back on this. A once-a-week run from the branch to the mine doesn't exactly make for riveting gameplay, but hey - at least it'll be through some dramatic scenery. edit - definitely didn't see me double post those screenshots.
ElphabaWS wrote:Railfan722 wrote:Route looks amazing, although the service mode is definitely going to be what holds me back on this. A once-a-week run from the branch to the mine doesn't exactly make for riveting gameplay, but hey - at least it'll be through some dramatic scenery. edit - definitely didn't see me double post those screenshots.
You are perhaps unaware that in addition to the turn to Potash, this line has regularly hosted daily 'dirt train" runs to/from Moab. The route will offer some excellent "gameplay" opportunities.
_o_OOOO_oo-Kanawha wrote:Who is the operator on these tracks/this railroad?
_o_OOOO_oo-Kanawha wrote:The scenery looks spectacular:
[img]http://www.drgw.net/trips/trips/moab-NDH-[apr-2007]/chapter.1/up-3364-emkay_ut-[27-apr-2007]-000-3504x2336.jpg[/img]
From the most interesting website: http://www.drgw.net/
But what can be played on this proposed DLC?
Railfan722 wrote:_o_OOOO_oo-Kanawha wrote:The scenery looks spectacular:
[img]http://www.drgw.net/trips/trips/moab-NDH-[apr-2007]/chapter.1/up-3364-emkay_ut-[27-apr-2007]-000-3504x2336.jpg[/img]
From the most interesting website: http://www.drgw.net/
But what can be played on this proposed DLC?
Not a whole lot, which is the kicker. There's two regular trains, a weekly potash train that runs the whole length, and a uranium tailings train that runs from Moab as far as the junction with the Green River Sub. With the potash train, there's a little bit of switching at either end of the line to make up the train, while with the uranium run it's mostly point-to-point as the special containers for the tailings are loaded on and off the train via a crane.
Power for both of these trains is usually a pair of whatever 6-axle power is lying around, which makes the choice of an SD40-2 and AC44 for the route logical, if a bit disappointing that no new locomotives are included.
ElphabaWS wrote:Perhaps it would be a good idea to wait and see exactly what the route includes and what range of scenarios and services are included before buying into the gloomy assumptions of one individual.
Users browsing this forum: No registered users and 1 guest