Hey all,
I've begun the restart of my SETEXAS route and placing some objects in the scenery. I haven't done much to date but am trying to take it slow and easy. I have a yard in the NE section of Houston that has several sets of tracks that are spanned by a multi-lane highway (I think that it is Loop I610 or betway 8).
I'm in the process of constructing the bridge over the tracks and I'm not sure what the process is. I've placed the abutments for the ends of the span and strung a set of girders between them. Which brings up the following questions.
1. based on the stains in the Google image it looks as though there are about 12 locations of girders in the span. Should all be put in?
2. What's next? Do I add in images of Highway Overpass objects from the collection of bridge images? or just lay a highway section over the girders? or both>
The railworks guide 5.04 has pretty good instructions for applying the grading around bridges and underpasses, I'll be messing with that after a bit.
Dave