I am in the early stages of preparation for the construction of a "highly-accurate" route, The Colorado and Southerns' Clear Creek line, from Denver to Silver Plume, a total of about 55 rail miles. The time frame would be 1920-1939. This would require dual-gauge rail between Denver and Golden. I have seen one picture of someone playing with it in railworks, but I am wondering how *
practical* it would be. Would dual-gauge switching be possible? Does railworks coding recognize track with more than one gauge?
I have all of the historical plans, documents, locomotive prints on hand, I just do not have the ability to transfer this into railworks (yet).
Example of the scenery:
