Hey All,
I'm not sure it this is the right forum for this question. If not, Admin, please move it.
I've been using Scale Rail track system for my route and have had problems connecting main line tracks to yard tracks. It takes a lot of fiddling around to get the tracks to join with out a track end bumper at the end of the joint. I've had a little luck by branching from the mainline with a mainline track and then joining a yard track and then changing the elevation of the end of yard track at some point to meet the terrain, then filling the gap between track and terrain with track ballast.
Is there a standard way of doing this operation? I think that I'm missing something in this procedure.
Thanks,
Dave