Moving a third rail after it has been laid down

Discussion about RailWorks route design.

Moving a third rail after it has been laid down

Unread postby robbit » Sun Aug 18, 2013 12:17 pm

Is there a way to change the offset amount of a third rail after it has been laid down? The offset that was used was like 5.0 but I need to change it on the whole route to 1.1. Is there an easier way then removing it all and redoing it?
robbit
 
Posts: 839
Joined: Fri Jul 15, 2011 11:29 am
Location: Maine

Re: Moving a third rail after it has been laid down

Unread postby Bananarama » Sun Aug 18, 2013 5:03 pm

I'm afraid you'll need to relay the sections.
Cheers!
Marc - 3DTrains

Image
User avatar
Bananarama
 
Posts: 2749
Joined: Sat Feb 14, 2009 1:17 am
Location: Another Planet

Re: Moving a third rail after it has been laid down

Unread postby robbit » Sun Aug 18, 2013 5:06 pm

That is a bummer but I will not tackle that job then I was going to try to fix the third rail section of the berlin to wittenberg route. Thanks for the info