Hi All,
I have been making scenarios for this route over the last couple of weeks and have struck a peculiarity with my east bound runs from Johnstown to Altoona. The problem lays with the east bound freight track at NY No1 Ewd Frtswitch. If I set the path through this switch my driver train derails. If I set east bound AI through the switch it comes to a halt and then concertina's itself with a subsequent scenario failure. To get around this, I route my east bounds along the passenger line and via NY No2 Ewd Psgr switch and things are fine. I'm not sure of I am using the right tracks on the eastbound run but going by the set of the signals and track marker names, I presume I am using the right track. I was wondering if this is documented or whether any one else is having this problem. Thanks for any advice....Rob